Loading...
Basements - 9 revisions
Select an older and a newer revision, then compare.
Rewrote the lede and section framing so the page reads as a shipped feature rather than a planned one
Corrected the status: basements shipped in the September 2026 update with three underground floors on residential lots
Refreshed the not-yet-shipped currency statement to the current live build
Updated timeline: underground building previewed May 29, 2026; arrival window now June 2026 update or later, ahead of the original Q4 schedule
Image cleanup: removed 1 duplicate or invalid image node
Select an older and a newer revision, then compare.
Each revision captures the state of this article at a specific point in time. Use the radio buttons to pick an older and a newer revision, then click "Compare selected revisions" to see the differences between them.