Loading...
Brick by Brick - Version 4 vs Version 5
Nov 9, 2026, 12:46 PM
Reconciled article structure and internal links
Nov 27, 2026, 09:40 PM
Added 2 internal links
11Overview2233Brick by Brick is a mini-game added to Hethereau Hobbies in Neverness to Everness with the September 9, 2026 Version 1.3 Phase 2 update. The update notes list it in a single line, "Add 'Brick by Brick' mini-game to Hethereau Hobbies", which places it in the same permanent hobby group as Mahjong, Volley Star and Going, Going, Gone! rather than among the limited-time events. It had appeared earlier on a community list of Version 1.3 activities without a date; the September 9 notes are the first first-party confirmation.4455Activity overview6677DetailStatusAddedSeptember 9, 2026 (Version 1.3 Phase 2)MenuHethereau Hobbies, under the City Tycoon menuOriginal announcement detailThe original update notes named the hobby without its rules.City Stamina cost1 City Stamina per 1,000 Fons paidMultiplayerNot stated88The worksite commissions use construction vehicles and pay Fons using City Stamina. Choose a site from the table below, then use its marked objectives and target time to plan the job.991010Related Pages11111212Hethereau Hobbies: the full hobby list and stamina tiers.Side Activities and Mini-Games: the wider mini-game index.Patch Notes: the September 9 update.13131414Construction commissions15151616Speak to the worker guarding a Duskmoor construction site to accept its job. The marked objectives use the vehicles at the site, rather than a combat encounter. Complete the work within its target time for the maximum payout.17171818WorksiteObjectivesMaximum FonsStarfallDrive the dump truck to its destination.15,000Tearlake OutletDemolish the marked buildings and use the forklift to move cargo to the loading area.30,000RivervaleDemolish buildings, excavate the marked soil and move cargo with the forklift.60,0001919The payout spends one City Stamina per 1,000 Fons. For forklift work, lower the fork before approaching a blue cargo tray, lift after it is secured and carry it to the highlighted loading zone. Demolishing marked structures first can leave more room to move. Excavation requires lowering and positioning the boom, stick and bucket over the marked soil.